Restoration works at Tinovul Iezerul Mare

Restoration works at Tinovul Iezerul Mare

Restoration works at Tinovul Iezerul Mare Status Date: 03.2024 Location: Tinovul Iezerul Mare com. Desești, Maramureș County   Iezerul Mare Peatland has already implemented all the restoration works, namely: placement of billboard; placement of tourist signs;...
Partial restoration works at Tinovul La Poduri

Partial restoration works at Tinovul La Poduri

Partial restoration works at Tinovul La Poduri Status Date: 03.2024 Location: Tinovul La Poduri com. Valea Ierii Cluj County   With the environmental permit and construction permit obtained, La Poduri Peatland has also benefited from some restoration works aimed...
Restoration works at Tinovul Bălileasa

Restoration works at Tinovul Bălileasa

Restoration works at Tinovul Bălileasa Status Date: 2-3.2024 Location: Tinovul Bălileasa com. Budureasa Bihor Department   After obtaining the environmental permit, as well as other authorizations required by the local institutions, part of the restoration works...

Restoration works at Tinovul Ic Ponor

Restoration works at Tinovul Ic Ponor Status Date: 2-3.2024 Location: Tinovul Ic Ponor com. Budureasa Bihor Department   After obtaining the environmental permit, as well as other authorizations required by the local institutions, all the restoration works...
Restoration works – in progress

Restoration works – in progress

Restoration works – in progress Status Date: 27.11.2022Location: Cluj-Napoca After field documentation, more optimal solutions were proposed for some restoration interventions to ensure better drainage in some peatlands. The procedure for receiving restoration...